Energy Metering Belfast & Northern Ireland
BSH Limited specifies energy metering for the heating, cooling and power plant it delivers, so operators have accurate consumption data for each service rather than a single building-wide total.
Energy Metering Belfast reflects BSH Limited's whole-system approach to plantroom delivery. BSH designs combination fuelled systems that include heating, cooling, combined heat and power, domestic and control systems as required — and metering each service is what turns that plant into measurable, manageable energy use.
Because BSH carries the mechanical and electrical scope together, metering is specified with the plant rather than added later: flow and energy meters for heating and cooling, electrical metering for CHP output, and sub-metering by service so the building owner can see where energy is actually going.
On a pre-packaged plantroom the metering is part of the off-site build, wired and tested in a controlled environment so it is ready to read on connection rather than installed reactively after commissioning.
Metering each service separately
Energy metering breaks a building's consumption down by service — heating, cooling, domestic hot water and on-site power — rather than a single utility total. On a combination fuelled system this includes heat meters on boiler and CHP circuits, energy meters on chiller and absorption-chiller duty, and electrical metering on CHP generation.
Specified with the plant, not after it
Because BSH designs the controls and electrical scope alongside the mechanical plant, metering is part of the same package. Meter locations, flow requirements and integration with the BEMS are considered at design rather than fitted retrospectively.
Built into a pre-packaged plantroom
Where the plantroom is pre-packaged, energy meters are selected and wired during off-site fabrication, so consumption data is available from first commissioning rather than after the plant has run unmetered.
Commercial applications
Where this service applies
- Plantrooms combining heating, cooling and on-site power
- Buildings needing consumption broken down by service
- Sites with CHP where generation output must be measured
- Pre-packaged plantrooms with factory-fitted metering
Benefits & considerations
What to consider
- Consumption broken down by service, not one building total
- Metering specified with the plant, not after it
- Electrical metering integrated with CHP output
- Factory-fitted meters ready to read from commissioning
Problem · Reaction · Solution
How BSH can help
Problem
A building with a single utility meter and no service-level metering cannot tell the operator whether energy is going to heating, cooling, domestic hot water or on-site power. Without that breakdown, efficiency improvements are guesswork: a CHP can run without anyone knowing its real contribution, and a chiller fault can drive consumption for weeks before it is noticed.
Reaction
Facilities managers and building owners need consumption broken down by service to see where energy actually goes and to prove the savings from any upgrade. Without sub-metering, the plantroom's performance is invisible and optimisation is reactive rather than engineered.
Solution
BSH specifies energy metering as part of its combined mechanical and electrical delivery, breaking heating, cooling and power consumption down by service. Because the right metering strategy depends on your plant and goals, the next step is to discuss your requirements with BSH's engineers. Contact BSH to discuss your energy metering project.