Award-winning Energy Plantrooms
BSH has been providing offsite fabrication facilities for almost three decades. Our pre-packaged plantrooms offer a plug and power solution.
Energy Plantrooms designed to order
BSH has been providing offsite fabrication facilities for almost three decades. Our pre-packaged plantrooms offer a plug and power solution to businesses for essential building services including heating and cooling.
Pre-erection assembly
BSH is able to carry out pre-erection of your modular system in a controlled environment off-site. Our pre-erection assembly service makes construction a rapid process, minimising down time at your plant or organisation as well as reducing costs due to the quick hook up and commissioning of the system once we are on site. Our processes mean that we can shave weeks off modern work programs.
Tailored systems
Each of our plantrooms is tailor made to match the space available as well as tailored to your fuel needs. We can design a combination fuelled system that includes heating, cooling, combined heat and power, domestic and control systems, as per your requirements. Each system is designed to meet the individual needs of a building, with your specific requirements met to maximise performance and efficiency.

Pre-packaged Energy Plantrooms — Key facts
The largest plug and power plantroom manufactured by BSH is 12m (long) x 3.5m wide x 3m high for Rolls Royce.
The largest plug and power plantroom in terms of power is 1.4Mw thermal which was manufactured for a local council in Scotland.
BSH holds the accolade for the largest trigeneration plant room in Europe in 2012 which was designed and built for Tesco in Naas, Co. Kildare, Ireland.
Why choose a pre-packaged plant room
Key benefits
- Reduced risk of fire and gas leaks to main building
- Quick and easy maintenance of operations
- Can accommodate multi fuel systems (gas, hybrid etc)
- Rapid installation due to numerous components being erected off site
- Ensured quality control with all work inspected prior to delivery
- Easily integrated into your existing system or used as a stand alone
- Easy on site access independent from the main building
- Lead times can be as little as 8 weeks from order and final design approval
- Environment control of plant area

Lead times can be as little as 8 weeks from order and final design approval.
Featured projects
Plantrooms we've delivered

Ferrari, Charles Hurst
Aberdeenshire Council

Yeovil College

NESST, Northumbria University
Our clients include


















Ready to step into the future?
From traditional energy sources to zero emission energies, we can help you take your business into the future.